C2i has completed hundreds of projects during the past five years; therefore making a detail listing of information of these projects would be excessive. Below is a partial listing of various project details.

PROJECT:
LOCATION:
DESCRIPTION:
DATE:
OWNER:
ENGINEER:
CONTRACTOR:

Mills River / North Fork Water Treatment Plant
Asheville, North Carolina
Water Treatment Plant
July 1996 to May 2000
City of Asheville, NC
Camp Dresser & McKee
Hayes & Lunsford

HOST COMPUTER:
I/O COUNT:
HARDWARE:

SOFTWARE:
RADIO:

PC's Running Windows NT
1500
Modicon (Mills River); Allen-Bradley (North Fork); Siemens (RTU)
Intellution
MDS (34 Sites)

C2i CONTRACT AMT.:
FIELD:
COMPUTER:
$950,000.00 / $250,000.00
$550,000.00 / $20,000.00
$400,000.00 / $230,000.00
C2i SCOPE: Complete set of field instrumentation including flow level, pressure and analytical instruments. Multiple PLC based control panels for complete plant control. In-plant data acquisition system using HMI software running on multiple personnel computers throughout the plant.


PROJECT:
LOCATION:
DESCRIPTION:
DATE:
OWNER:
ENGINEER:
CONTRACTOR:
UOSA Wastewater Treatment Plant
Fairfax County, Virginia
Wastewater Treatment Plant
January 1997 to present
Upper Occaquan Sewage Authority
CH2M Hill
Poole & Kent
HOST COMPUTER:
I/O COUNT:
HARDWARE:
SOFTWARE:
Bailey
In Progress
Bailey
Bailey
C2i CONTRACT
AMOUNT:
$2,200,000.00
C2i SCOPE: Provided over 600 field instruments including 43 venturi tubes, 45 magnetic flow meters and a variety of additional flow, level, pressure and analytical instruments. The plant control system utilized a Bailey DCS system. The Bailey remote units were installed by C2i in some of the 64 control panels in C2i’s scope.


PROJECT:
LOCATION:
DESCRIPTION:
DATE:
OWNER:
ENGINEER:
CONTRACTOR:
Blue Plains WWTP Dewatering Facility
Washington, DC
Wastewater Treatment Plant
February 2002 to present
DC Water & Sewer District
Corporation
W.M. Schlosser
HOST COMPUTER:
I/O COUNT:
HARDWARE:
SOFTWARE:
RADIO:
Xycom PC's Running Windows 2000
2540
Modicon
Intellution HMI
None
C2i CONTRACT AMT.:
$935,000.00
C2i SCOPE: Dewatering system network management and control, including 14 centrifuges and 5 conveyor trains. Modicon QuantumPLC's and Intellution HMI software.


PROJECT:
LOCATION:
DESCRIPTION:
DATE:
OWNER:
ENGINEER:
CONTRACTOR:
Henrico County Water Treatment Plant
Henrico County, Virginia
Water Treatment Plant
July 1999 to present
Henrico County, VA
Camp Dresser & McKee
W.M. Schlosser
HOST COMPUTER:
I/O COUNT:
HARDWARE:
SOFTWARE:
RADIO:
Dell PCs Running Windows NT
Analog = 448; Discrete = 1,392
Siemens TI555
Intellution IFIX
None
C2i CONTRACT AMT.:
FIELD:
COMPUTER:
$1,650,000.00
$990,000
$660,000
C2i SCOPE: Developed and implemented a PC based control and data acquisition system for the Henrico County Water Treatment Plant. The system consists of 4 PLC's with 14 remote I/O cabinets. 3 PLC's communicate over F.O. to its respective RIO. The fourth PLC communicates over dedicated leased phone line. The computer system is 10 Dell Poweredge 2400's.


PROJECT:
LOCATION:
DESCRIPTION:
DATE:
OWNER:
ENGINEER:
CONTRACTOR:
Northwest Cobb WRF Automation
Kennesaw, Georgia
Water Treatment Plant
December 2001 to Present
Cobb County Water System
Parsons Engineering Science
Control Instruments, Inc.
HOST COMPUTER:
I/O COUNT:
HARDWARE:
SOFTWARE:
PCs Running Windows NT
1500
Texas Instruments
Intellution IFIX
C2i CONTRACT
AMOUNT:
$1,027,465.00
C2i SCOPE: Design-build project with C2i as the lead contractor. The project involved modifications and improvements to the existing instrumentation, control and electrical control system to achieve full automation of the facility. New programmable logic controllers (PLC's) were provided, as well as expansion of existing meters, ultrasonic level transmitters, dissolved oxygen analyzers, sludge blanket detectors, in addition to sludge moisture, chlorine residual and ammonia analyzers were provided. Also, 29 electric operators were provided and installed to automate existing gates. The existing HMI software and computers were upgraded and replaced with up-to-date units.


PROJECT:
LOCATION:
DESCRIPTION:
DATE:
OWNER:
ENGINEER:
CONTRACTOR:
Fowler Water Reclamation Facility
Forsyth County, GA
Wastewater Treatment Plant
July 2003 to present
Forsyth County, GA
Metcalf & Eddy
Ruby-Collins
HOST COMPUTER:
I/O COUNT:
HARDWARE:
SOFTWARE:
RADIO:
PC's Running Windows XP
250
Allen-Bradley
RSView SE HMI
None
C2i CONTRACT AMT.:
$199,956.00
C2i SCOPE: Brand new wastewater reclamation facility, integrating Zenon membrane filters and Trojan UV systems. Allen-Bradley SLC PLC's and RSView SE HMI software..


PROJECT:
LOCATION:
DESCRIPTION:
DATE:
OWNER:
ENGINEER:
CONTRACTOR:
Valrico Advanced WWTP Expansion
Hillsborough County, FL
Wastewater Treatment Plant
April 2001 to July 2002
Hillsborough County, FL
Malcolm Pirnie
Cardinal Contractors
HOST COMPUTER:
I/O COUNT:
HARDWARE:
SOFTWARE:
RADIO:
PC's Running Windows 2000
500
Allen-Bradley
Citect HMI
None
C2i CONTRACT AMT.:
$450,000.00
C2i SCOPE: Existing wastewater treatment plant SCADA system implementation. Allen-Bradley ControlLogix PLC's and Citect HMI software.